Logistics Coordinator Senior Control TechnicianElectrical and Instrumentation Superintendent,BPTTElectrical InspectorElectrical QA/Electrical QC Inspector:Power Plant
Work Type
Full TimeConsultingSeasonal Work
Location Preference
On-Site
Location:
Siparia, Trinidad & Tobago
Open to relocation:
Yes
Important To Me
Career advancementWork-life balanceCompany CultureFlexible work hoursPersonal development programsHealthcare benefitsWork from home optionPaid time offTeam Building / Company RetreatsPaid sick leave
Summary
Results-driven Logistics Coordinator with a proven track record in optimizing operational efficiency, enhancing customer satisfaction, and ensuring timely delivery of goods.
Detail-oriented Logistics Coordinator skilled in logistics analysis and operational efficiency. Track record of improving delivery accuracy and fostering cross-functional collaboration to enhance customer service and safety compliance.
Dynamic logistics professional with extensive experience in coordinating logistics operations and managing inventory levels. Known for problem-solving and decision-making skills, successfully implementing process enhancements that reduce delays and drive customer satisfaction.
1
Certification
36
years of professional experience
Work History
Logistics Coordinator
6 Years 7 Months
Concepts And Services Company Limited | Port Of Spain, Trinidad And Tobago | 01.2020 - Current
Coordinated logistics operations, ensuring timely delivery of goods and adherence to schedules.
Managed inventory levels using advanced tracking systems to optimize stock availability.
Implemented process improvements that enhanced operational efficiency and reduced delays.
Collaborated with cross-functional teams to streamline supply chain activities and communication.
Oversaw scheduling and routing processes, enhancing delivery accuracy and customer satisfaction.
Senior Control Technician
1 Year 3 Months
Glens Engineering Services | San Fernando, Trinidad And Tobago | 09.2015 - 12.2016
Diagnosed and repaired electrical control systems to ensure optimal performance.
Developed and implemented preventative maintenance schedules for instrumentation equipment.
Collaborated with engineering teams to improve automation processes and system efficiency.
Completed critical repairs and maintenance of electrical systems and program software.
Analyzed system failures and recommended design modifications to enhance reliability and safety.
Demonstrated commitment to safety by adhering to all company policies and industry regulations while performing tasks on-site or remotely.
Electrical and Instrumentation Superintendent,BPTT
2 Years 1 Month
Concepts And Services Company Limited | Port Of Spain, Trinidad And Tobago | 07.2013 - 08.2015
Led instrumentation project teams to ensure timely completion of installation and maintenance tasks.
Developed and implemented safety protocols for instrumentation operations, enhancing workplace safety compliance.
Mentored junior technicians in troubleshooting and repair of complex instrumentation systems.
Streamlined calibration processes, improving accuracy and reducing downtime for critical instruments.
Managed inventory of instrumentation tools and equipment, ensuring availability for ongoing projects without delays.
Reviewed project specifications, ensuring alignment with industry standards and client requirements.
Established preventive maintenance schedules to minimize equipment failures and unplanned outages.
Led troubleshooting efforts to quickly resolve instrument malfunctions and restore functionality.
Conducted thorough inspections of electrical systems for compliance with safety standards and regulations.
Evaluated electrical installations and identified potential hazards to ensure operational safety.
Collaborated with engineers to address noncompliance issues and recommend corrective actions.
Assisted in developing inspection protocols to enhance efficiency and accuracy in assessments.
Addressed potential issues proactively with regular follow-up inspections, ensuring compliance with corrective action plans.
Collaborated with cross-functional teams to ensure seamless project execution while maintaining high standards of safety and quality control.
Strengthened relationships with clients by attending pre-construction meetings to discuss project requirements and address potential concerns early on in the process.
Safeguarded public health and safety through diligent enforcement of electrical code standards during all stages of construction projects.
Reduced the risk of electrical hazards by meticulously inspecting wiring installations, equipment, and appliances for adherence to codes and regulations.
Improved client satisfaction with timely completion of inspection reports, providing valuable feedback on necessary corrective actions.
Electrical QA/Electrical QC Inspector:Power Plant
7 Months
C and Z Engineering | Industrial Estate, La Brea | 01.2010 - 08.2010
Conducted inspections on incoming materials to ensure compliance with quality standards.
Utilized precision measuring instruments to assess product specifications and tolerances.
Collaborated with production teams to resolve quality issues and implement corrective actions.
Developed and maintained detailed inspection reports to track product quality trends.
Monitoring and control the commissioning of a 220 kv Switch yard
Installation of grounding system according to the NFPA codes and standards
Did all quality inspection and certification of all Disconnecting Switches,Surge Arrestors,Isolators and Earthing Switches.
Maintained compliance with industry regulations through meticulous record-keeping and documentation of inspection results.
Senior Electrical Supervisor,Melamine Complex
1 Year 9 Months
Control Technologies Limited | Point Lisas Industrial Estate Trinidad | 03.2008 - 12.2009
Supervised installation and maintenance of electrical systems, ensuring compliance with safety standards.
Coordinated team activities to enhance workflow efficiency and project completion timelines.
Mentored junior electricians, providing training on best practices and technical skills.
Implemented preventive maintenance programs, reducing downtime and improving system reliability.
Collaborated with engineering teams to troubleshoot complex electrical issues effectively.
Ensured adherence to quality standards by closely monitoring the workmanship of electricians on site.
Senior Electrical Technician, Alantic LNG Plant
7 Months
Stork Elecon Limited | Point Fortin, Trinidad And Tobago | 08.2006 - 03.2007
Supervised installation and maintenance of electrical systems to ensure compliance with safety standards.
Diagnosed and repaired complex electrical issues, improving system reliability and performance.
Led team in conducting preventive maintenance on electrical equipment, increasing operational efficiency.
Developed training programs for junior technicians, enhancing skill development and knowledge transfer.
Completed the main grounding grid for Atlantic LNG PLANT
Completed the main car park lighting.
Led junior technicians, providing guidance and sharing expertise to improve overall team performance.
Provided technical support during commissioning stages of major projects, ensuring seamless transitions from construction to operation phases.
Electrical Supervisor:Methanol 5000
10 Months
Proman GMBH | Point Lisas Industrial Estate Couva | 09.2004 - 07.2005
Supervised electrical installations, ensuring compliance with safety regulations and industry standards.
Coordinated maintenance schedules to enhance equipment reliability and minimize downtime.
Led a team of technicians in troubleshooting and resolving complex electrical issues efficiently.
Implemented process improvements that increased operational efficiency and reduced project timelines.
Collaborated with project managers to align electrical work with overall project goals and deadlines.
Resolved technical issues swiftly, applying troubleshooting expertise for minimal disruption to ongoing operations.
Supervise the interconnection of the UPS,DCS andPLC systems
Worked alongside ABB and Siemens Engineers for plant commissioning
Electrical Supervisor,Nitrogen 2000 Plant
10 Months
Proman GMBH | Point Lisas Industrial Estate Couva | 09.2003 - 07.2004
Supervised installation and maintenance of electrical systems to ensure compliance with safety standards.
Led team in troubleshooting electrical issues, enhancing operational efficiency and minimizing downtime.
Developed training programs for junior electricians, improving skillsets and knowledge retention within the team.
Coordinated project timelines and resources, delivering projects on schedule while adhering to budget constraints.
Conducted regular inspections of electrical installations, ensuring adherence to regulatory compliance and quality standards.
Supervised and evaluated installation and repair of lights and power in buildings and facilities.
Supervise the interconnection of the UPS,DCS,and PLC systems.
Supervise the termination of the 13.8 kv and4260v generator cables
Supervise the function testing of the high and low voltage switch gears.
Senior Electrical Technician: Caribbean Nitrogen
6 Months
Proman GMBH | Point Lisas Industrial Estate,Couva | 10.2001 - 04.2002
Led troubleshooting and repair of electrical systems, ensuring compliance with safety standards.
Oversaw installation and maintenance of complex electrical equipment, enhancing operational efficiency.
Mentored junior technicians on best practices in electrical diagnostics and repair techniques.
Developed and implemented preventive maintenance schedules to reduce downtime of key systems.
Perform the interconnection of cables for the medium and low voltage switch gears.
Perform the alteration wiring of the MCC starter circuits.
Worked directly under the supervision of ABB Electrical Engineers
Diagnosed and repaired electrical systems, ensuring compliance with safety regulations and standards.
Installed, maintained, and tested electrical equipment, enhancing operational reliability across various projects.
Electrical Technician:Caribbean Methanol Plant
11 Months
Trinidad and Tobago Electrical Contractors | Point Lisas Industrial Estate Couva | 02.1993 - 01.1994
Installed and maintained electrical systems, ensuring compliance with safety standards.
Did the installation of all instrument devices on the plant alongside fellow workers.
Didthe termination of instrument cables i both MCC and Control rooms.
Install the cable system for all cables: high, medium,low andinstrument cables according to Engineering designs and specifications.
Conducted regular inspections of electrical systems, ensuring optimal performance and regulatory compliance.
Installed electrical conduit and wiring for power, controls, and lighting.
Assisted in new equipment installations, guaranteeing proper setup and optimal performance.
Electrical Technician:
2 Months
Insertech Caribbean Limited | Phoenix Gas Plant Savonetta Claxton Bay | 09.1992 - 11.1992
Electrical and Electronic Technician; ESA
2 Years 4 Months
Clico Energy Company Limited | European Space Center , Kourou French Guiana | 03.1990 - 07.1992
Diagnosed and repaired electronic systems to ensure optimal performance and reliability.
Worked with French and Russian Engineers on theSoyouz Command center for the Soyouz Integration and launch facilities.
Worked under the guidance and supervision of Engineers from Spain,Holland,Germany and Italy on the launch system for the Ariane 5 integration and launch facilities.
Worked alongside Engineers from France,Germany,Italy,Spain,Belguim and Switzerland on the commissioning of the launch pad for the Ariane 5 rocket.
Worked engineers from Spain,Holland,and Ukraine on the commissioning of theVega rocket launch pad.
Worked under the supervision of engineers from the French firm Eiffage Metal to commission the overpass crane at the Booster Integration building.
Did wiring of the space Agency Administration building under the supervisionon of Canadian Engineers.
Did the wiring of the Satellite preparation building under the supervision of Engineers from France and Switzerland.
Education
High School Diploma
Cowen Hamilton Senior Secondary | Indian Walk, Moruga | 07-1976
Certificate of Proficiency in Human Resource
School of Management Studies | San Fernando, Trinidad And Tobago
Project Management - Project Management
Institute of Tertiary Education | San Fernando, Trinidad And Tobago
Operation Management - Management Studies
Gopee School of British Courses | San Fernando, Trinidad And Tobago | 02-2026